With the preservation works progressing to the grade 2* listed tower, we are 22 weeks into a 43 week project, along with the growing heritage centre / cafe.
Our experienced team received an excellent score in the first CONSIDERATE CONSTRUCTORS SCHEME Audit, outperforming the LB of Islington required minimum score of 36, fresh site initiatives should increase the score at the next visit.