31st January 2011

Lengard has been appointed by the London Borough of Lambeth to refurbish Kingswood Primary School in West Norwood.

A vacant Victorian School on a sloping multi-level site, Kingswood has neighbouring residential units opposite and to the left, a Pupil Referral Unit to the right and a railway line behind.

The works comprise:

  • A complete internal refurbishment including stripping out all existing furniture and wall, floor and ceiling coverings and replacement with new.
  • Extensive brickwork and roofing repairs with all existing timber sash windows being replaced with new aluminium windows (circa 200No windows), new rainwater gutters and downpipes and new fascia and soffits.
  • The mechanical package is a complete strip out and replace with new, and the electrical is to be a cut and carve on new and existing.
  • The external works involve complete new drainage to the building and incoming electrical works and will reduce levels to the entire site.
  • The formation of three new playground areas which include specialist play equipment.
  • There is also some structural glazed balustrading to one side of the building.
  • The project duration is 29 weeks and it is valued at £2.9m.