Value: £2.1m
Client: London Borough of Ealing
Programme: 52 weeks
Description: New Build and Refurbishment
As an established partner of the London Borough of Ealing, Lengard was commissioned to extend St Mark’s Primary School, having refurbished and remodelled six other schools over the previous five years.
The school site remained in use throughout the contract. Adjacent to the site were residential properties and access for construction access was via a private road, requiring great tact and diplomacy.
The two storey classroom building consisted of six new classrooms, staff rooms and toilets. The building was designed with steel frame, concrete floor slabs and cavity walls.
Remodelling works included refurbishment of the kitchen and toilets, external works to the car park and a new MUGA playground.
A green sedum roof was installed along with a ground source heat system.