Lengard
Visit the Lengard Education Website Latest News

Testimonials

"Lengard Limited have been engaged by the London Borough of Redbridge to carry out the refurbishment of two properties over four phases, comprising refitting of interior ceilings, partitions, flooring etc renewal of windows, rewiring and co-ordination of named sub-contractors for replacement boiler, heating system and air conditioning system.

I am pleased to say that the works was carried out in a timely and professional manner, to a very demanding programme, and was completed on target despite some difficulties beyond Lengard´s control.

Lengard´s project team have been co-operative, responsive and helpful throughout. We would have no hesitation in using Lengard on future projects."

Allen Salisbury

London Borough of Redbridge

"Lengard are an easy Company to work with. What needed to be done was done. We couldn't have wished for more co-operation, nothing was too much trouble. I congratulate the Lengard site team."

Nigel Sykes

Project Manager - London Borough of Wandsworth (Design Services)

"Lengard were totally professional in all meetings and in dealing with the LEA and other agencies. They were approachable for children, parents and staff. Indeed they did assemblies with the children regarding safety and joined in with ´ work week´. They planned the programme to fit into the school schedule on a daily basis and managed their works admirably. We have had a lot of major work done at Millfields over the past 13 years and I can honestly sat that this has been the most successful, pain and stress free of all the projects because of Lengard's excellent management"

Dame Anna Hassan

Executive Head - Millfields Community School

"Lengard approach construction delivery with a true partnering ethos, creating excellent working relationships with the client and key stakeholders. We experienced severe design complications in the early stages of the contract that created the opportunity for Lengard to become contractual but, to their credit, they did not. Lengard went on to win the respect of the project team and, in 30 years, I cannot remember a more positive project experience"

George Vas

London Borough of Camden

"I would like to express my gratitude to you and your team for the successful project completion. Lengard performed exceptionally well and have produced a job to be proud of, on time and to budget. All that remains for me to say that I have enjoyed working with your team on the project, particularly the ´can do´ attitude, and have no problem in recommending you for future work"

R Hartley

Metropolitan Police

"I write to express my appreciation of the co-operation extended to myself and to all the school staff whilst you were managing the recent roof project. Whilst on site, you dealt with any problems brought to your attention in a swift, direct and polite manner and accommodated the various personalities and, where possible, the various requests made by staff"

Barbara Draper

Newport Free Grammer School

"Working within a sensitive environment, Lengard worked very effectively with the Depaul Trust who provide shelter for disadvantaged and vulnerable youths, ensuring the needs of residents and end users were kept as a priority consideration. Lengard also provided valuable input at design stage, which enabled the construction to commence sooner"

Keith Tickner

Baily Garner LLP

"Lengard have been working for Freshwater Group on the prestigious Park West Place development since 1999, undertaking roof renewals, window repair and external redecoration, more recently, a new mechanical mains supply was installed, servicing all 560 apartments; an example, in part, of the scope of works undertaken by Lengard.

The longevity of the contract to Lengard is testament to the excellent working relationship nurtured and developed with the residents, the Project Managers (Cardoe Martin), and Freshwater in-house project team. The logistics were difficult, whilst working in occupation at all times. The amalgamation of services was excellently managed and co-ordinated and I congratulate the Lengard team on a job well done"

Steve Adams

Freshwater Group

"Lengard have recently completed our wonderful Children’s Centre after approx 8 months on site. Such was our positive experience that it is important that I recommend them to others! For eight months they worked alongside the main pedestrian entry to the school. In all this time there was not a single complaint and walkways and driveways were kept open and well screened. The standard of the completed is perhaps the highest I have seen in a school environment. Potential clients are welcome to visit St Paul’s to see the quality and attention to detail themselves. "

Carolyn Cohen

Head Teacher - St Paul’s Primary School & Children’s Centre – Rusthall, Kent.